Chat with us, powered by LiveChat

Wellpoint Dewatering

Civil Contractor

Wellpoint 1

Wellpoint Dewatering

Requirements

Wellpoint dewatering system supplied and installed by NPE to enable the safe and dry access to the work area.

The success of the dewatering system was made even more evident due to the fact that despite it being right next to a lake and in sandy soil, it was kept completely dry withour the need of sheet piles or other seperation methods.

Equipment

BBA PT150 piston pump

6″ Layflat hose

6″ BBA HDPE header pipe

Flexbows

PVC spears

Various pipeline bends and fittings


National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.

© 2019 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.