National Pump & Energy (NPE) has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia. Basically, when it comes to pumping, power generation and compressed air equipment, NPE are your total solutions partner. We offer tailored solutions and service. Our personal and detail oriented approach, means you can be assured all project requirements will be met. Below are some examples of our extensive experience across the construction, mining, oil & gas, municipal, agricultural and industrial industries.
ConsMin’s primary asset, the Woodie Woodie mine site, about 400km southeast of Port Hedland, includes open-pit mining, a 1.6Mtpa processing plant, and vast exploration tenements.
Read MoreDewatering for student accommodation with a 2-level basement involved installing perimeter and pit systems for depths of 5m to 6.5m.
Read MoreNPE provides premium pumping, power generation, and associated equipment, customized for site needs. Collaborating on a Sydney apartment complex dewatering project, NPE employed 300m wellpoint dewatering, alongside water treatment installation (CDU, dosing unit, clarifiers, Metals Removal Module) to tackle high heavy metal groundwater levels.
Read MoreAfter recent Murray River flooding, NPE rapidly supplied and mobilized a pump and 700m hose to move 800,000,000 litres behind a levee bank, aiding the Old Murray Bridge Refurbishment Project and dewatering the area within 5 weeks, meeting client needs promptly.
Read MoreThe Newcastle West 1 Pump Station upgrade was prompted by population growth and new apartment construction.
Read MoreNPE provided a temporary works proposal for managing sewer bypass operations at the HB01 Wastewater pump station in Killcare. They employed advanced telemetry and control functions, offering online logins to the client.
Read MoreFor Melbourne Water’s Western Treatment Plant upgrades, BMD Constructions is replacing the existing 55E Activated Sludge Plant with a new 150 ML/d Nutrient Removal Plant (NRP).
Read MoreGrowth Built engaged NPE to provide a complete dewatering and groundwater treatment solution to facilitate the construction of an 11-storey mixed-use building overlaying a four-level basement car park in Shell Cove, NSW.
Read MoreNPE was engaged by Rockform Developments to provide a complete groundwater dewatering, water treatment, and environmental monitoring solution for a 9-storey mixed-use building with a two-level basement car park, necessitating the removal of PFAS, hydrocarbons, high iron levels, dissolved metals, and other contaminants to comply with Port Stephen Council, WaterNSW, and NSW-EPA standards before discharge.
Read MoreThe digester’s emptying and cleaning process utilized specialized pumping equipment suspended from a 60-ton crane, ensuring efficient operation and flexibility; this was facilitated by NPE’s adaptation of a heavy-duty hydraulic unit.
Read MoreNPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the local water authorities wastewater network.
Read MoreNPE were contacted by Narrabri Council to assist with the recent flooding event in the region. A trailer-mounted 6” pump was required to assist in flood mitigation works.
Read MoreNPE provides NSW SES with a quick turnaround pump hire service to help prevent flood damage in regional NSW.
Read MoreOur client Tonkin Gap Alliance is constructing the Northern Dive as part of its METRONET Morley-Ellenbrook Line rail enabling works.
Read MoreA local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works.
Read MoreDue to aging infrastructure, the client was engaged to commence the re-lining of 39 Wastewater Pumping Chambers throughout South Australia.
Read MoreDue to the recent Murray River flooding, NPE were engaged by the client to provide a proposal for contingency Bypass Pumping for the MBO1 Pumping Station, which draws water directly from the Murray River and, via processing and several booster pump stations, eventually feeds water to the southern suburbs of Adelaide.
Read MoreGeorgiou contacted NPE to install a Dewatering system into a new subdivision in Ellenbrook, WA.
Read MoreNPE was asked to provide a screening solution that would allow the local council to take their entire inlet works offline for an extended period to facilitate the strip out, re-coating and refurbishment of their inlet works at the Byron Bay sewage treatment plant.
Read MoreDM Civil engaged with NPE to assist with a Wellpoint Dewatering System for a new DN1200 emergency overflow storage tank for the North Thomson Sewerage Pump Station #06 on Rottnest Island in WA.
Read MoreNPE, providing pumping solutions for the removal of marine silt and growth.
Read MoreNPE were engaged to develop and install a culvert plug solution for Melbourne Water’s Shakespeare Grove Main Drain Renewal project.
Read MoreThe client requested improved oxygen levels in the ponds at an Eastern Treatment Plant in Melbourne.
Read MoreOne of our valued customers asked us to provide a dewatering system to lower groundwater levels in preparation for constructing a basement carpark for their apartment building.
Read MoreA great client of ours installed an underground (UG) pump station, and expected flow rates to range from 100lps – 250lps.
Read MoreNPE Emptied and Cleaned Four Thickener Tanks Within a 12hr Shift.
Read MorePort Hedland Marina.
Read MoreNPE Yatala Emergency Response Team
Read MoreNPE were engaged in cleaning out & inspecting a man-hole.
Read MoreNPE was engaged in taking on a large flow Wellpoint Dewatering project south of Perth for deep sewer works.
Read MoreNPE is carrying out daily onsite system checks.
Read MoreReturn Pond Water Clean
Read MoreNPE was engaged to help our long-term offshore client with the flushing of their subsea infrastructure.
Read MoreNational Pump and Energy, keeping lights on in the Pilbara.
Read MoreJust another average day for the Newcastle Team.
Read MoreNPE has worked with a long-standing client in the Bowen Basin since 2015, supplying them with pumps as part of a project to aid in reducing water volumes on-site via the use of high-pressure sprays.
Read MoreNPE’s scope is the necessary work to complete the equipment relocations and the welding, pre-spooling, assembly, and installation of field pipelines for the project.
Read MoreNPE was chosen to undertake the dewatering for the storage tank installation at the Virginia Stormwater Pump Station.
Read More© National Pump & Energy 2024