The perimeter wellpoint system consisted of over 100 spears placed 5 meters in the ground on both the inside and outside of the sheet piling.
Supply pumps and water treatment system to dewater site to allow for basement level excavation and construction.
The perimeter wellpoint system consisted of over 100 spears placed 5 meters in the ground on both the inside and outside of the sheet piling.
© National Pump & Energy 2023