Wellpoint Dewatering

Supply pumps and water treatment system to dewater site to allow for basement level excavation and construction.

Wellpoint Dewatering

The perimeter wellpoint system consisted of over 100 spears placed 5 meters in the ground on both the inside and outside of the sheet piling.

Wellpoint Dewatering

Requirements, Equipment and Images

  • BBA PT150 Electric drive pump
  • 6″ HDPE header pipe and hosing
  • 6m spears
  • Flex bows
  • Automatic PH dosing unit
  • Sediment filtering tank

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs