Temporary Pond Water Transfer

The client had a significant build-up of solids in their process area run-off pond. They needed it removed.

Hydromining – Pumps - Engineering - Project Management

NPE supplied complete removal of solids, using the highly effective hydromining method.

This involved agitation of the solids via high pressure water cannon and removal of build-up as slurry. This resulted in their full pond water capacity being re-instated.

The products we were dealing with were process slimes, fines and other miscellaneous solids. The removal of the solids build-up was completed within 5 days.

Temporary Pond Water Transfer

Requirements, Equipment and Images

Hydromining of process area run-off pond.

  • 6 inch hydraulic controlled water cannon
  • Cannon booster pump
  • Dragflow slurry pump
  • Discharge booster pump
  • Split frame pump engines
  • HPU
  • General spooling and pipework
  • Mobile workshop

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs