Temporary Pit Dewatering

The task was to provide temporary pit dewatering services, using pontoon pump system and booster pumps, at Higginsville, in the Goldfields Western Australia.

Water Management – Dewatering - Engineering - Project Management

The product was mine and rain water. NPE dewatered the chalice pit (200lt/sec @ 200m TDH).

Services provided in conjunction with this project include: engineering, design, installation, commissioning and decommissioning as well as transport of HDPE and pumping system and full design of pipe system.

NPE got the job done efficiently and effectively.

Temporary Pit Dewatering

Requirements, Equipment and Images

Dewater chalice pit (200lt/sec @ 200m TDH)

  • 220kw 1000v pontoon pumps
  • 250hp diesel driven trailer mounted transfer pumps
  • 750kva diesel generator set
  • 7km of 350mm HDPE pipeline supply and installation
  • 55,000lt bulk diesel fuel supply system

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs