The product was mine and rain water. NPE dewatered the chalice pit (200lt/sec @ 200m TDH).
Services provided in conjunction with this project include: engineering, design, installation, commissioning and decommissioning as well as transport of HDPE and pumping system and full design of pipe system.
NPE got the job done efficiently and effectively.