Pump Hire & Dewatering supplied by NPE. Recent heavy rain filled a Gold Coast quarry with excessive stormwater which stopped production. NPE were called to supply pumps and hose to remove 900,000,000 litres of water from the area.
Remove 900,000,000 litres of water from a Gold Coast quarry, filled with excessive stormwater which stopped production.
Pump Hire & Dewatering supplied by NPE. Recent heavy rain filled a Gold Coast quarry with excessive stormwater which stopped production. NPE were called to supply pumps and hose to remove 900,000,000 litres of water from the area.
Dewater 900,000,000 litres within the quarry in 20 days. NPE supplied 2 x 8″ pumps and hose to run 24/7 for 20 days to remove the water so that the area could be returned to a safe and productive area.
© National Pump & Energy 2023