Pipelines & Construction, Ceduna SA

NPE’s scope is the necessary work to complete the equipment relocations and the welding, pre-spooling, assembly, and installation of field pipelines for the project.

The Jacinth-Ambrosia mine site is located approximately 300km northwest of Ceduna, South Australia.
An existing Mining Unit Plant is to be relocated from Jacinth North to the Ambrosia deposit, approximately 5km away, whilst returning the ModCoD tailing deposition to Jacinth North.

The Project is being managed and resourced from WA with logistic and administration support from Adelaide.

There are 4 distinct pipelines to be extended, modified, repositioned and or re-purposed, including multiple dual-service road crossings.

NPE’s scope has expanded to be essentially self-sufficient with the addition of earthworks. This necessitated the mobilisation of our 30T excavator, which had laid dormant for many months at Hazelmere.

With an extensive range of specialist pipe and welding personnel and equipment on-hand (including pipe, rubber hose and lay flat hose, fittings and connectors and electrofusion machines), NPE delivers the complete range of pipeline services to the highest industry standards.

Watch our Project Video here

Pipelines & Construction, Ceduna SA

Requirements, Equipment and Images

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs