NPE provided a complete pond clean service using a highly trained crew to carry out the task, at the Barrick Gold Granny Smith Gold Mine, Western Australia. This project was conducted on a day and night shift. NPE also conducted a comprehensive pond lining inspection and repair.
The process water source pond at Granny Smith Gold Mine had filled up over time with material solids. This reduced available process water volume to critically low levels. NPE completed the job in seven days, hydromining to remove approximately 10,000m3 with substantial cost savings to the client.