Dual Sided Wellpoint Dewatering System, NSW

Just another average day for the Newcastle Team.

For a number of major NSW infrastructure projects, we recently completed:

• 100m dual-sided wellpoint system
• Sterilised 700m of 600mm water main
• Decommissioning a major sewer bypass with 4 x 150mm pumps
• Installed additional wellpoint dewatering for a new subdivision with a major civil contractor

Huge shout out to the team for delivering on these projects.

If you require water management and treatment assistance on your project, please give us a call, we would love to help.

Dual Sided Wellpoint Dewatering System, NSW

Requirements, Equipment and Images

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs