For a number of major NSW infrastructure projects, we recently completed:
• 100m dual-sided wellpoint system
• Sterilised 700m of 600mm water main
• Decommissioning a major sewer bypass with 4 x 150mm pumps
• Installed additional wellpoint dewatering for a new subdivision with a major civil contractor
Huge shout out to the team for delivering on these projects.
If you require water management and treatment assistance on your project, please give us a call, we would love to help.