The task was complicated as the job was located in a residential area, requiring street closures and sound restraints. The project was monitored 24/7 for three days.
The project’s bypass depths were 29m. It required a crane man box to lower personnel into the sewer to be able to pressure wash & clean it out.
NPE supplied a flow management plan which included installing bypass pumps, and we were required to set up a sewer bypass for two man-holes.
This critical bypass project was completed with 0 incidents, on time and within budget.
NPE has a huge range of hire pump and power equipment for bypass works, with all equipment in stock and ready to deploy to your site.