Well Point Dewatering, Perth WA
NPE were engaged by Alita Constructions to install dewatering at 2 different locations at their project located on Dowd St, Welshpool.
The purpose of the install was to allow the client to excavate below the water table to complete the final connection of the site stormwater system and install a large aerobic treatment unit.
We had our dewatering pumps and equipment delivered to site, the systems installed and running within 48 hours! The job ran for most of the week.
The client was really happy and the job was completed safely, and in a timely manner.
Wet Season Management in North-West Queensland Mining
NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…
Bypass Pumping Solution at Boundary Creek
National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…
Creek Bypass & Dewatering Success at Mullet Creek
When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…
Wellpoint Dewatering System Rottnest Island
Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…




