Well Point Dewatering, Perth WA
NPE were engaged by Alita Constructions to install dewatering at 2 different locations at their project located on Dowd St, Welshpool.
The purpose of the install was to allow the client to excavate below the water table to complete the final connection of the site stormwater system and install a large aerobic treatment unit.
We had our dewatering pumps and equipment delivered to site, the systems installed and running within 48 hours! The job ran for most of the week.
The client was really happy and the job was completed safely, and in a timely manner.
Large-Scale Evaporation for TSF Risk Reduction
Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the…
Onsite Ammonia Treatment and Discharge Enablement – Newcastle
National Pump & Energy (NPE) were engaged to address elevated ammonia levels in a client’s storm water retention pond after…
Engineering Meets Expertise: NPE Partnered with Nacap on a Remote Wind Farm
National Pump & Energy (NPE), in partnership with Nacap, delivered an innovative water management solution for a remote wind farm…
High-Performance Quarry Pumping Solutions for Extreme Weather Events- QLD
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…
Wastewater Treatment Plant – Digester Cleaning in South Australia
NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…
Huntingdale Sewer Infrastructure Dewatering Project
Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…
NPE Bypass Solutions for Black Rock Water Reclamation Plant
National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…