Civil-Dewatering-Tug Harbour Project, WA
NPE were contracted to perform dewatering work and water treatment for the development of new Tug Harbour and material offload facility at Hunt point on Port Hedland’s Finucane Island. The new Tug Boat Harbour will house an extra 8 tugs, serves to lay some of the foundations for a massive outer harbour expansion in the near future. Our scope of works involved the design, supply, installation and maintenance of dewatering system for the highly challenging harbour project, where a 250m x 250m excavation was planned to be constructed, 22m below ground level and 16m below sea level inside a highly permeable rock wall.
Dewatering incorporated the drilling and installation of multiple bore holes, welding and positioning of two ring mains circling the entire construction zone using the 355mm diameter pipes, for a total of 2.5 km of pipe works installed. The primary focus was to keep the excavation area 16m below sea level dry while excavation works are in commencement. The dewatering set up has a pumping capacity of 24,000 m³ per day. On top of that, water treatment set up were also part of project requirements with the extracted water treated via the chemical dosing unit prior to discharge into the sedimentation ponds and the ocean.
NPE’s dewatering was so successful that a water cart was needed in the base of the excavation in order to minimise the dust 16m below seal level.
Wellpoint Dewatering Solution Delivered for Modcon Civil- SA
Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…
Eastern Treatment Plant Bypass – Melbourne, VIC
National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…
Bore Pump Installations & Commissioning – Kalgoorlie WA
The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…
DN630 Pipeline Welding & Installation Project – Queensland
National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…
Poly Butt Welding for Resource Recovery Park
National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…
NSW Central Coast Sewer Bypass Upgrade
National Pump & Energy was engaged to design, supply, install, and maintain a temporary sewer bypass pumping system to support…
Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success
We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…