DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of a broader infrastructure upgrade project. The works involve the welding and tie-in of a large-diameter polyethylene pipeline designed to enable efficient water storage and transfer. This engagement forms part of an active and ongoing construction…

Read More

Restart Ready: Delivering Critical Pontoon Pumping Power in Queensland

National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire and Sales, Generator Hire, Pipeline and Construction, Engineering, Remote Telemetry, Consulting, Site Support and Disaster Recovery Management. National Pump & Energy are proudly apart of the Atlas Copco Group. As part of a major minerals…

Read More

Large-Scale Evaporation for TSF Risk Reduction

Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the Tailings Storage Facility (TSF). The solution effectively mitigated risks associated with elevated and unstable dam conditions, providing a practical and reliable response to site requirements. It supported compliance with EPA legislation while reducing reliance on…

Read More

High-Performance Quarry Pumping Solutions for Extreme Weather Events- QLD

National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire and Sales, Generator Hire, Pipeline and Construction, Engineering, Remote Telemetry, Consulting, Site Support and Disaster Recovery Management. National Pump & Energy are proudly apart of the Atlas Copco Group. Quarry pit dewatering is essential for…

Read More

Wet Season Management in North-West Queensland Mining​

NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily restricted access, but the team managed the impacts well. They used every available window for treated water releases and kept the site’s water balance steady compared to the previous period. The team also used mechanical…

Read More

Broadbeach Dewatering & Water Treatment QLD

Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the project required a 6 level basement over 4385square meters in size. The lowest excavation will be 20m below sea level (-20mAHD). Currently the excavation is to the 6th basement level and the remaining lift pits…

Read More

Bypass Pumping, Carseldine QLD

NPE was engaged to provide a sewer bypass while an existing main was realigned, the project’s larger scope is to construct a bridge over a rail crossing. Constraints we overcome with collaborative works between NPE and our client. We thank our client and the government authorities for the opportunity to provide our services.

Read More

Pump Station Bypass – Queensland

A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works. The bypass needed to be capable of 75L/S, this was diverting flow from a DN900 line. NPE mobilised the necessary pumps & pipework (200m) in a prompt manner delivering…

Read More

Power Station, Ravenswood QLD

The Gold Mine Required NPE to start and run a 12 MW ball mill, the diesel power station was required to go from no load to 18MW starting current and then back to 12MW continuous load as the mill gets to rated speed. NPE designed a 26 MW power station complete with 12MW of resistive…

Read More