NPE were engaged by Newcastle City Council to provide an efficient, cost-effective and environmentally sustainable solution to desilt a lined leachate pond and subsequently dewater the sludge to produce dewatered cake with at least 20% dry solids content at the Summerhill Waste Management Centre. Desludging and dewatering works were initiated by the council to restore the holding capacity of the pond, allow inspection of the liner integrity, and assess adopted technology performance.

NPE proffered a turnkey sludge dewatering solution that utilised a containerised screw press that reduced sludge volume by at least 80% in a single step. The leachate sludge dewatering system included the installation of a sludge screw press, sludge thickening tank, macerator pumps, slurry pumps, water cannon, sludge bin, potable water tank, chemical/polymer tanks and dewatering fittings and accessories. Bunding of the screw press area was also undertaken to contain leachate leaks.

The enclosed design ensured a reduction in odour and noise during operation. The relatively low energy demand of the screw press, owing to its low operating speeds, compared with other sludge dewatering techniques, was an added benefit. Once polymer dosing was optimised to yield desirable robust flocs, the containerised screw press provided an efficient, fully automatic mechanical sludge dewatering.

The screw press produced an average of 178 kgs of dry solids/hour with at least 90% solids capture rate. Daily screw press operations were optimised for a 4-5 wt% total solids feed sludge and max feed sludge flow rate of 4 500L/h with an average active polymer usage of 4.4-6.8kg/ dry tonne with a mean cake dryness of 42% achieved. A maximum of 47% and a minimum of 38 % cake dryness were achieved during operations.

The project demonstrated NPE’s capability to provide an integrated sludge management solution, assisting clients in significantly reducing their sludge disposal costs.

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…

Read More

NPE Shines at NT Resources Week 2025

National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…

Read More

EnviroPacific: Former PDP2 Oily Wastewater Pond Remediation

NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse…

Read More

Broadbeach Dewatering & Water Treatment QLD

Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the…

Read More

Alkimos Seawater Desalination Plant Perth, WA

The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per…

Read More

Sewer Bypass of Naracoorte WWTP. Naracoorte SA

NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure…

Read More

Dewatering Rustlers Roost

NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end…