Sewer Treatment Plant Wellpoint Dewatering – NSW
National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers at a MidCoast Council STP.
The project required effective groundwater control within excavations extending to approximately 6 metres below ground level. Site investigations identified predominantly fine to medium-grained sandy soils, with groundwater inflows estimated between 10 and 50 litres per second. Maintaining dry and stable excavation conditions was critical to allow the construction works to proceed safely and efficiently.
To support the client's construction program, NPE designed and supplied two dedicated wellpoint dewatering systems to facilitate the concurrent construction of both clarifiers. The solution included the installation of two 80-metre wellpoint systems to a depth of 7 metres using a 20-tonne excavator.
The wellpoint systems were designed to lower groundwater levels within the 24-metre diameter sheet-piled excavations, providing effective groundwater control and maintaining stable excavation conditions throughout the project.
By delivering a reliable and efficient dewatering solution, NPE is helping to minimise groundwater-related construction delays and support the successful delivery of this critical wastewater infrastructure upgrade.
Sewer Treatment Plant Wellpoint Dewatering – NSW
National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…
Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project
As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…
Wellpoint Dewatering Solution Delivered for Modcon Civil- SA
Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…
Eastern Treatment Plant Bypass – Melbourne, VIC
National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…
Bore Pump Installations & Commissioning – Kalgoorlie WA
The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…
DN630 Pipeline Welding & Installation Project – Queensland
National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…
Poly Butt Welding for Resource Recovery Park
National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…