Sewer Bypass, Victoria

NPE was engaged by our client to design and deliver a reliable sewer bypass system with a duty capacity of 50 litres per second at 60 metres head, complete with 100% redundancy.

The system was configured to extract from two sewer manholes and discharge into an existing rising main. To ensure continuous performance monitoring and rapid response, NPE integrated advanced telemetry across the bypass setup. This system enabled real-time access via a dashboard and was programmed to send automated alarm notifications to a designated list of mobile contacts, including NPE staff, in the event of any faults or emergencies.

 

 

Sewer Treatment Plant Wellpoint Dewatering – NSW

National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…

Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project

As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…

Poly Butt Welding for Resource Recovery Park

National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…