Sewer Bypass, Victoria
NPE was engaged by our client to design and deliver a reliable sewer bypass system with a duty capacity of 50 litres per second at 60 metres head, complete with 100% redundancy.
The system was configured to extract from two sewer manholes and discharge into an existing rising main. To ensure continuous performance monitoring and rapid response, NPE integrated advanced telemetry across the bypass setup. This system enabled real-time access via a dashboard and was programmed to send automated alarm notifications to a designated list of mobile contacts, including NPE staff, in the event of any faults or emergencies.
NSW Central Coast Sewer Bypass Upgrade
National Pump & Energy was engaged to design, supply, install, and maintain a temporary sewer bypass pumping system to support…
Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success
We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…
Proud Entertainment Sponsor of the CCFWA Awards Night 2026
The CCFWA Awards Night 2026 was a fantastic evening celebrating excellence across Western Australia’s civil construction industry. We were proud…
Residential Development Dewatering & Water Treatment – Calderwood, NSW
Building on the success of long-term dewatering and water treatment works in the Illawarra region, National Pump & Energy (NPE)…
Jack Achieves Tradesman Qualification at NPE Perth Branch in Western Australia
We are proud to announce that Jack has officially qualified as a Tradesman after successfully completing his apprenticeship at NPE…
Restart Ready: Delivering Critical Pontoon Pumping Power in Queensland
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…
Large-Scale Evaporation for TSF Risk Reduction
Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the…