Onsite Ammonia Treatment and Discharge Enablement – Newcastle

National Pump & Energy (NPE) were engaged to address elevated ammonia levels in a client’s storm water retention pond after several significant rain events. The ponds were at capacity and needed treatment prior to being able to discharge offsite.

Supplementing the customers ongoing existing efforts, NPE designed and delivered an onsite water treatment system to enable compliant offsite discharge, specifically targeting elevated ammonia levels.

The treatment train successfully reduced ammonia to a level that could not be detected, allowing the client to discharge water from site. Following the successful performance of the NPE-designed treatment plant, the client extended the scope of works.

Delivered over a six-week period, the project highlighted NPE’s strong design and installation capability and demonstrated the potential to replicate this solution across waste facilities nationwide.

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…

Poly Butt Welding for Resource Recovery Park

National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…

NSW Central Coast Sewer Bypass Upgrade

National Pump & Energy was engaged to design, supply, install, and maintain a temporary sewer bypass pumping system to support…

Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success

We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…