NPE Bypass Solutions for Sewerage System Upgrades in Geelong Victoria

NPE - Breakwater Bypass Pumping Geelong 03
NPE - Breakwater Bypass Pumping Geelong 02
NPE - Breakwater Bypass Pumping Geelong 01

A need for NPE bypass solutions arose due to essential maintenance and upgrades of the sewerage system in the Geelong region. NPE was responsible for designing, supplying, installing, and maintaining five bypasses in Geelong West, Geelong South, and Breakwater to facilitate the upgrade works.

These bypasses featured a variety of setups, such as submersible pumps and silenced canopy pumps, along with telemetry controls, hoses, valves, and other necessary equipment. Our experienced crew handled all installation and maintenance. Our approach is built on experience and innovation. We aim to deliver technical design support, turn-key solutions, durable and reliable equipment, and effective project management within the project's budget and timeline.

Powering Remote Mining Operations with Reliable Off-Grid Energy

National Pump & Energy was engaged to deliver and commission a complete remote power solution to support critical underground services…

Sewer Treatment Plant Wellpoint Dewatering – NSW

National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…

Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project

As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…