Mosaic Parkside Subdivision Dewatering WA
Bos Civil is currently undertaking the Mosaic Parkside Subdivision, Stage 1 project in Balcatta. This involves deep excavation and service installation. With the primary challenge of groundwater, extensive dewatering is required due to the depth of the excavations.
To address this, the NPE team have installed doublesided Wellpoint systems to lower groundwater levels and localised sump pumping to manage water levels in trenches. The wellpoint systems are being installed with NPE’s drill and flush rig due to difficult ground conditions. Water discharged from dewatering operations is going into onsite infiltration trenches with twice daily environmental testing as required per DMP.
The construction methodology includes staged excavations and dewatering installs so BOS Civil can progress through their scope without interruption. Overall, with this clearly outlined plan, Bos Civil aims to successfully complete the project within a 15-week timeframe.
Residential Development Dewatering & Water Treatment – Calderwood, NSW
Building on the success of long-term dewatering and water treatment works in the Illawarra region, National Pump & Energy (NPE)…
Jack Achieves Tradesman Qualification at NPE Perth Branch in Western Australia
We are proud to announce that Jack has officially qualified as a Tradesman after successfully completing his apprenticeship at NPE…
Restart Ready: Delivering Critical Pontoon Pumping Power in Queensland
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…
Large-Scale Evaporation for TSF Risk Reduction
Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the…
Onsite Ammonia Treatment and Discharge Enablement – Newcastle
National Pump & Energy (NPE) were engaged to address elevated ammonia levels in a client’s storm water retention pond after…
Engineering Meets Expertise: NPE Partnered with Nacap on a Remote Wind Farm
NPE in partnership with Nacap, delivered an innovative water management solution for a remote wind farm spanning a 12-kilometre pipeline…
High-Performance Quarry Pumping Solutions for Extreme Weather Events- QLD
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…