Digester Clean Wastewater Treatment Plant, Boliver SA

The process of emptying and cleaning the digester involved using specialised pumping equipment provided by NPE. This was suspended from a 60-ton crane for efficient operation and flexibility of movement.

The pump used for this task was a heavy-duty hydraulic unit specifically adapted by NPE to handle these projects. To remove the contents of the digester, NPE had set up a discharge line connected to an existing pipeline leading to a storage lagoon.

This setup allowed for a smooth and controlled transfer of materials. Throughout the emptying and confined space entry procedures, NPE consistently conducted gas level tests and monitoring to ensure safety. This approach helped maintain a secure working environment and prevent potential risks. If you require any assistance with similar tasks, feel free to contact NPE. They have the expertise and equipment necessary to handle complex projects with the utmost safety and efficiency.

High-Performance Quarry Pumping Solutions for Extreme Weather Events- QLD

National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…

Wastewater Treatment Plant – Digester Cleaning in South Australia

NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…

Huntingdale Sewer Infrastructure Dewatering Project

Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…

NPE Bypass Solutions for  Black Rock Water Reclamation Plant

National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…