Burwood Beach Wastewater Treatment Plant Bypass, NSW

Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise.

The discharge location was located at the ABF Tower rising main 160m from the pump location, discharged by 450mm poly. Their system was configured to notify a predetermined list of mobile numbers, including NPE staff, with an alarm text in the case of high or low levels, which could cause overflow.

Sewer Treatment Plant Wellpoint Dewatering – NSW

National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…

Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project

As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…

Poly Butt Welding for Resource Recovery Park

National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…