Burwood Beach Wastewater Treatment Plant Bypass, NSW

Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise.

The discharge location was located at the ABF Tower rising main 160m from the pump location, discharged by 450mm poly. Their system was configured to notify a predetermined list of mobile numbers, including NPE staff, with an alarm text in the case of high or low levels, which could cause overflow.

Powering Remote Mining Operations with Reliable Off-Grid Energy

National Pump & Energy was engaged to deliver and commission a complete remote power solution to support critical underground services…

Sewer Treatment Plant Wellpoint Dewatering – NSW

National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…

Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project

As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…