Belconnen Trunk Sewer Augmentation – ACT

NPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the local water authorities wastewater network. NPE’s role was to install, commission and manage the sewer via a pumped overland bypass in order to provide a dry double isolated pipeline that would allow our client to complete their tie works. The window for installation and completion of the works was extremely tight. Access was difficult as the alignment ran parallel to a major roadway where the pipe alignment snaked through a sensitive green site where disturbance to the local flora was to be kept to a minimum.

NPE designed a sewer bypass system where we supplied 4 x BA300E pumps to ensure that the nominated PDWF rate of 650 l/s with 100% redundancy could easily be achieved whilst still providing additional capacity to meet higher PWWF that were likely to be encountered during the tight project timeline due to the stormy and unpredictable wet weather the area had been receiving.

Due to the critical nature of the project and tight time frames of operation, NPE provided 24/7 on-site monitoring in conjunction with the telemetry system to ensure that the risk of overflow was removed in the event of ramping the bypass up to cater for PWWF due to the shallow collection manhole for the bypass and presence of an overflow point upstream which meant levels within the bypass collection manhole had to be kept to a minimum at all times.

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…

Bypass Pumping Solution at Boundary Creek

National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…

Creek Bypass & Dewatering Success at Mullet Creek

When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…

Wellpoint Dewatering System Rottnest Island

Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…