Posts Tagged ‘VIC’
Bypass Pumping, Carseldine QLD
NPE was engaged to provide a sewer bypass while an existing main was realigned, the project’s larger scope is to construct a bridge over a rail crossing. Constraints we overcome with collaborative works between NPE and our client. We thank our client and the government authorities for the opportunity to provide our services.
Read MoreCardinia Pump Station Upgrade, Cardinia VIC
NPE was engaged to supply a potable water bypass pumping system, while the existing Monbulk pump station at Silvan Reservoir was receiving a major structural overhaul and new pumps. In conjunction with AMS and Melbourne Water a bypass system was designed to be able to confidently take the existing pump station offline for an extended…
Read MoreBypass Solutions, Monbulk VIC
NPE was engaged to supply a potable water bypass pumping system, while the existing Monbulk pump station at Silvan Reservoir was receiving a major structural overhaul and new pumps. In conjunction with AMS and Melbourne Water, a bypass system was designed to be able to confidently take the existing pump station offline for an extended…
Read MoreBypass Solutions Victoria
NPE was contracted to carry out an emergency stormwater bypass installation due to the pump station experiencing multiple pump failures, which reduced pump station capacity. New replacement pumps had been ordered for the pump station, but there was a substantial lead time for the replacement pumps’ arrival. It is even more critical to have a…
Read MoreWastewater Treatment Plant, VIC
As part of ongoing upgrades to Melbourne Water’s Western Treatment Plant, BMD Constructions are building a new 150 ML/d Nutrient Removal Plant (NRP) that will replace the existing 55E Activated Sludge Plant. The project involves constructing five NRP clarifier tanks, interconnecting pipe works, blower and service buildings, and several pump stations. However, before the construction…
Read MoreGlen Huntly Level Crossing Works, VIC
NPE worked closely with the SPA team to execute the installation and development of dewatering wells for Glen Huntly Level Crossing works, under both occupation and train running environments. The client required the hire and installation of pumps, sediment tanks / water treatment and local pipe routes to manage the pumping of groundwater out of…
Read MoreSewage Bypass, 18m Deep Manhole – Victoria
NPE were engaged in managing and constructing a sewer bypass for new sewer connections works to be carried out in a 10-day operation. Our Melbourne team are the leading provider in bypass pumping. We deliver the complete bypass solution. With flow management plans, Telemetry displays full visibility on critical pumping performance values & flow, pumping…
Read MoreBypass Critical Works – Victoria
Bypassing a critical sewer pump station for major upgrades! Swan Street sewer pump station is the most crucial station in Wangaratta’s sewer network as it gathers and transports almost half of the town’s waste to the treatment facility. The station, which is over 70 years old, has recently undergone renovations to accommodate the town’s expanding…
Read More