Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The system featured two diesel pumps configured for duty and backup operation, ensuring uninterrupted flow management throughout the works. Installed near the inspection manhole, the setup included automated level control and backup activation to maintain performance…

Read More

Bypass Pumping Solution at Boundary Creek

National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust bypass pumping solution at Boundary Creek during essential rehabilitation works. The primary objective was to maintain continuous creek flow while safeguarding the surrounding environment. To achieve this, NPE deployed three high-capacity submersible pumps housed within…

Read More

Creek Bypass & Dewatering Success at Mullet Creek

When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater seepage, and meeting strict environmental requirements. National Pump & Energy (NPE) delivered a complete creek bypass and dewatering solution, deploying high-capacity pumps with remote telemetry, sediment control systems, and backup capacity for rain events.  …

Read More
NPE is supporting critical sewer and water infrastructure works at West Dapto

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney, where 19,000 new homes are planned. ​ The project includes over 9km of gravity sewer main (via open trenching and microtunnelling), 700m of rising main with 400m of HDD, a pump station upgrade, and nearly…

Read More

NSW TCM Bypass

NPE was engaged in providing a temporary works proposal that details the operating strategy and management of the sewer bypass works for the HB01 Wastewater pump station in Killcare. NPE utilised the latest telemetry options and control functions and supplied online logins to the client. 3 x electric submersibles located within the collection manhole that…

Read More

Bypass Pumping, Penrith NSW

NPE Supplying Penrith with a Wastewater Bypass System to Facilitate Pump Station Upgrades Installing a wastewater bypass system in Penrith marks a significant milestone in upgradingthe main pump station. NPE, a leading provider of wastewater solutions, has successfully supplied and installed the system, ensuring minimal disruption to essential services during the upgrade process. The wastewater…

Read More

Sewage Bypass Management Project Tuross, NSW

NPE Temporary Sewage Bypass Management Project Underway in Tuross, NSW NPE is pleased to announce that it has been engaged by IronBuilt Infrastructure to commence the temporary sewage bypass management and construction project in Tuross, NSW. The project aims to facilitate the upgrade of the existing infrastructure by the Civil team. NPE has diligently developed…

Read More

Dewatering for the construction of an apartment complex in Sydney, NSW

NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment for hire or sale to suit any requirement. Committed to sourcing the world’s best equipment brands, NPE delivers the best-performing, safest and most reliable gear for your site.  NPE doesn’t just deliver a piece of equipment, we work with our…

Read More

Burwood Beach Wastewater Treatment Plant Bypass, NSW

Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise. The discharge location was located at the ABF…

Read More