The Brighton Beach Scarborough site underwent refurbishment of its stormwater drainage outfall network to enhance water management into the Indian Ocean. This case study highlights the project components, encountered challenges, and implemented solutions.
Originally a two-week project, the timeline extended due to design amendments from the principal client, resulting in additional planning adjustments. A Dewatering Management Plan was developed by NPE that included:
- Effluent Discharge: Directed to an infiltration basin with 1.5m bunded walls.
- Monitoring: Daily discharge field monitoring and weekly lab water sample analysis to ensure compliance with discharge criteria.
Dewatering & Stormwater bypass pumping is required for several areas in the project. This includes the existing bubble-up pit designated for the 1450mm diameter concrete pour around its base. Additionally, dewatering is necessary for the area surrounding the concrete-encased outfall pipe, which has an inside diameter (ID) of 375mm (450mm OD ‘outside diameter’) and spans 6 meters in length and 1.5 meters in width. Furthermore, there are six screw piles that are 4 meters deep, with the top 2 meters wrapped in Denso tape, also requiring dewatering. A stormwater bypass system was required to be installed in the existing access chamber infrastructure to manage and maintain the active use of the main stormwater drain network whilst construction works are underway.
The Scarbrough Beach refurbishment aimed to improve stormwater drainage while meeting environmental regulations. Despite extended timelines, effective collaboration ensured successful outcomes while protecting the local ecosystem.
Wet Season Management in North-West Queensland Mining
NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…
Bypass Pumping Solution at Boundary Creek
National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…
Creek Bypass & Dewatering Success at Mullet Creek
When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…
Wellpoint Dewatering System Rottnest Island
Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…