Thickener Tank Cleaning – Goldfields WA
During the February Processing Plant shutdown, maintenance tasks were carried out simultaneously on Nickel and Copper Thickeners.
Tool time requirement was 96 hours, and all four thickeners were required to be emptied and cleaned within a 12-hour shift. Our client cannot achieve this in-house; therefore, historically, they only attempted to maintain 1 or 2 thickeners per shutdown, increasing their risk of failure and decreasing the mean time between failures, neither of which are desirable outcomes.
NPE was engaged in cleaning four thickeners tanks and removing the volume of water/slurry from the work fronts to the tailings dam to ensure a safe working environment for the maintenance staff.
Equipment used to complete this project:
- Diesel pump (pressure pump)
- Water cannons
- Hydraulic submersible pump
- Hydraulic power unit
- Weco high-pressure hose
- 4 x NPE personnel
The project was completed safely and in time, allowing our client to complete the tool time required during this critical part of their shutdown.
“NPE has gone above and beyond with helping us successfully maintain our thickeners this shutdown. They arrived at the site early to supervise the installation of the hydro-mining cannons onto scaffold towers. They tested the water pump ready for cleaning and set up the over-pumping facilities to de-water the area. The four guys on the ground worked well as a team; they were knowledgeable and had a strong focus on safety.
Personnel was organized, cleaning quicker than we could dispose of the product and thorough. Highly recommend getting this team back in for the next shut.” NPE Client.
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…
Read MoreBypass Pumping Solution at Boundary Creek
National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…
Read MoreCreek Bypass & Dewatering Success at Mullet Creek
When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…
Read MoreWellpoint Dewatering System Rottnest Island
Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…
Read MoreNPE Doubles the Impact
We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…
Read MoreWest Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read More