The Jacinth-Ambrosia mine site is located approximately 300km northwest of Ceduna, South Australia.
An existing Mining Unit Plant is to be relocated from Jacinth North to the Ambrosia deposit, approximately 5km away, whilst returning the ModCoD tailing deposition to Jacinth North.
The Project is being managed and resourced from WA with logistic and administration support from Adelaide.
There are 4 distinct pipelines to be extended, modified, repositioned and or re-purposed, including multiple dual-service road crossings.
NPE’s scope has expanded to be essentially self-sufficient with the addition of earthworks. This necessitated the mobilisation of our 30T excavator, which had laid dormant for many months at Hazelmere.
With an extensive range of specialist pipe and welding personnel and equipment on-hand (including pipe, rubber hose and lay flat hose, fittings and connectors and electrofusion machines), NPE delivers the complete range of pipeline services to the highest industry standards.
High-Performance Pumping Solutions for Extreme Weather Events- QLD
Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…
Assisted Water Reduction Using Evaporation Fans in Queensland
Our client required a 24-unit evaporator fan package at Cannington Mine to lower water levels within the Tailings Storage Facility…
NPE Bypass Solutions for Black Rock Water Reclamation Plant
National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…
Wet Season Management in North-West Queensland Mining
NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…