Open Pit Dewatering, Southern Cross WA

This project involves installing and commissioning a leak detection system designed by NPE for a client located in Southern Cross, WA.

The system is installed in Fraser Pit, located on the town’s outskirts. NPE has engineered and installed the system and is responsible for selling the leak detection system to the client. The system is designed to be used in two stages. The first stage involves using two 90kw MineTuff pumps, which will pump at 210l/s initially. The second stage will use three 90kw MineTuff pumps, which will pump at 185l/s. The duration of pumping is set to take 242 days to pump a total of 3,247,591 m3 of water.

The impellers have been trimmed to suit the water’s specific gravity to ensure the pumps operate efficiently. The primary objective of this project is to ensure the reliable and efficient pumping of water while detecting and preventing any leaks that may occur in the system. If you require a leak detection system, please don’t hesitate to contact us today. Our team of experts is ready to assist you in finding the best solution for your needs and ensuring that your system operates effectively.

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…

Read More

Bypass Pumping Solution at Boundary Creek

National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…

Read More

Creek Bypass & Dewatering Success at Mullet Creek

When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…

Read More

Wellpoint Dewatering System Rottnest Island

Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…

Read More

NPE Doubles the Impact

We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…

Read More

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…

Read More

NPE Shines at NT Resources Week 2025

National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…

Read More