Old Murray Bridge Refurbishment – SA

Due to the recent Murray River flooding, NPE was tasked with supplying a pump set up to move 800,000,000 litres behind a levee bank as soon as possible so that the client could continue with their main works for the Old Murray Bridge Refurbishment Project.

NPE quickly mobilised the pump and 700m of hose to the site, delivering an effective solution that met the client’s requirements.


Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…

Read More

Bypass Pumping Solution at Boundary Creek

National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…

Read More

Creek Bypass & Dewatering Success at Mullet Creek

When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…

Read More

Wellpoint Dewatering System Rottnest Island

Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…

Read More

NPE Doubles the Impact

We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…

Read More

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…

Read More

NPE Shines at NT Resources Week 2025

National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…

Read More