Old Murray Bridge Refurbishment – SA
Due to the recent Murray River flooding, NPE was tasked with supplying a pump set up to move 800,000,000 litres behind a levee bank as soon as possible so that the client could continue with their main works for the Old Murray Bridge Refurbishment Project.
NPE quickly mobilised the pump and 700m of hose to the site, delivering an effective solution that met the client’s requirements.
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…
Read MoreBypass Pumping Solution at Boundary Creek
National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…
Read MoreCreek Bypass & Dewatering Success at Mullet Creek
When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…
Read MoreWellpoint Dewatering System Rottnest Island
Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…
Read MoreNPE Doubles the Impact
We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…
Read MoreWest Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read More