NPE were engaged by PACT Construction for the Dewatering, Water Treatment & Environmental scope for the development of Riviere Luxury Residence in Applecross. Several large footing foundations and multiple general excavations will require dewatering for the first stage of the project. With limited dewatering discharge options available in the area, discharge to the Swan River was the only viable option to suit the flow rates required to dewater the site.

NPE water treatment team successfully designed a suitable system to handle the removal of heavy metals and nutrients apparent in the water to suit the local discharge criteria. The complete system can be remote monitored to check we are achieving acceptable water results while discharging into this highly sensitive eco system. NPE environmental team also has a full environmental scope to undertake, including daily monitoring of groundwater levels in the surrounding area and all daily discharge fields and laboratory testing.

This project has got off to a great start and shows why NPE are the complete one stop shop and market leaders for Dewatering, Water Treatment & Environmental in the construction industry.

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…

Read More

NPE Shines at NT Resources Week 2025

National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…

Read More

EnviroPacific: Former PDP2 Oily Wastewater Pond Remediation

NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse…

Read More

Broadbeach Dewatering & Water Treatment QLD

Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the…

Read More

Alkimos Seawater Desalination Plant Perth, WA

The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per…

Read More

Sewer Bypass of Naracoorte WWTP. Naracoorte SA

NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure…

Read More

Dewatering Rustlers Roost

NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end…

Read More