We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA. 

The following morning, NPE mobilised all plant and technician specialists to start the wellpoint installation. The ground’s existing building materials, including rubble, bricks, steel, car diffs, and other obstructions, became apparent during wellpoint attempts, and this caused us to rethink and change our installation approach.

To ensure we could achieve the required invert depth, NPE provided an alternative wellpoint installation solution allowing the wells to stay open for the installation of each spear, maintaining absolute screen coverage of the gravel pack. 

NPE also provided a localised sump pumping method staged across the areas as needed, which was sent into the dewatering discharge lines and all boosted approximately 200m away from the designated on-site infiltration basin. This was done because the actual ground soils also contained peat layers that were about 4-5 metres deep. 

This job was a great success and provided a fantastic opportunity to utilise NPE’s specialist knowledge when up against unforeseen challenges.

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…

Read More

Bypass Pumping Solution at Boundary Creek

National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…

Read More

Creek Bypass & Dewatering Success at Mullet Creek

When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…

Read More

Wellpoint Dewatering System Rottnest Island

Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…

Read More

NPE Doubles the Impact

We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…

Read More

West Dapto Dewatering & Water Treatment NSW

NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…

Read More

NPE Shines at NT Resources Week 2025

National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…

Read More