Civil-Dewatering-Tug Harbour Project, WA
NPE were contracted to perform dewatering work and water treatment for the development of new Tug Harbour and material offload facility at Hunt point on Port Hedland’s Finucane Island. The new Tug Boat Harbour will house an extra 8 tugs, serves to lay some of the foundations for a massive outer harbour expansion in the near future. Our scope of works involved the design, supply, installation and maintenance of dewatering system for the highly challenging harbour project, where a 250m x 250m excavation was planned to be constructed, 22m below ground level and 16m below sea level inside a highly permeable rock wall.
Dewatering incorporated the drilling and installation of multiple bore holes, welding and positioning of two ring mains circling the entire construction zone using the 355mm diameter pipes, for a total of 2.5 km of pipe works installed. The primary focus was to keep the excavation area 16m below sea level dry while excavation works are in commencement. The dewatering set up has a pumping capacity of 24,000 m³ per day. On top of that, water treatment set up were also part of project requirements with the extracted water treated via the chemical dosing unit prior to discharge into the sedimentation ponds and the ocean.
NPE’s dewatering was so successful that a water cart was needed in the base of the excavation in order to minimise the dust 16m below seal level.
High-Performance Quarry Pumping Solutions for Extreme Weather Events- QLD
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…
Wastewater Treatment Plant – Digester Cleaning in South Australia
NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…
Huntingdale Sewer Infrastructure Dewatering Project
Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…
NPE Bypass Solutions for Black Rock Water Reclamation Plant
National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…
Wet Season Management in North-West Queensland Mining
NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…





