Civil-Dewatering-Tug Harbour Project, WA

NPE were contracted to perform dewatering work and water treatment for the development of new Tug Harbour and material offload facility at Hunt point on Port Hedland’s Finucane Island. The new Tug Boat Harbour will house an extra 8 tugs, serves to lay some of the foundations for a massive outer harbour expansion in the near future. Our scope of works involved the design, supply, installation and maintenance of dewatering system for the highly challenging harbour project, where a 250m x 250m excavation was planned to be constructed, 22m below ground level and 16m below sea level inside a highly permeable rock wall. 

Dewatering incorporated the drilling and installation of multiple bore holes, welding and positioning of two ring mains circling the entire construction zone using the 355mm diameter pipes, for a total of 2.5 km of pipe works installed. The primary focus was to keep the excavation area 16m below sea level dry while excavation works are in commencement. The dewatering set up has a pumping capacity of 24,000 m³ per day. On top of that, water treatment set up were also part of project requirements with the extracted water treated via the chemical dosing unit prior to discharge into the sedimentation ponds and the ocean. 

NPE’s dewatering was so successful that a water cart was needed in the base of the excavation in order to minimise the dust 16m below seal level.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at a North-West Queensland mine site to lower water levels within the…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…