Pump Station Bypass – Queensland

A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works. The bypass needed to be capable of 75L/S, this was diverting flow from a DN900 line. NPE mobilised the necessary pumps & pipework (200m) in a prompt manner delivering…

Read More

Power Station, Ravenswood QLD

The Gold Mine Required NPE to start and run a 12 MW ball mill, the diesel power station was required to go from no load to 18MW starting current and then back to 12MW continuous load as the mill gets to rated speed. NPE designed a 26 MW power station complete with 12MW of resistive…

Read More