Student Accommodation Development – NSW

Student Accommodation Development

Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going further 1.5m deep to 6.5m BEGL.

Installation of 240m perimeter dewatering system along with localised pit dewatering. Treatment to ANZEC 95% Freshwater guidelines.

The Chemical Dosing System installation was recommended for efficient water clarification and pH correction. The system is designed to effectively remove silt, sand, and other solids from water at flow rates of up to 5L/s. This makes it an excellent choice for sites with limited space. The system incorporates the addition of flocculants, coagulants, and pH adjustments throughout the treatment process. It also includes monitoring features such as pH, turbidity, and flow meter measurements. The final step of the treatment process at Richards Crookes involves the use of a metals removal module (MRM) for oxidation and filtration, specifically targeting elevated metal concentrations in the water.

Richard Crookes site encounters the presence of heavy metals in its groundwater, including Aluminium, Arsenic, Zinc, Manganese, and Iron. These heavy metals pose a challenge for the project and NPE is committed to meeting the ANZECC & ARMCANZ (2000) freshwater quality guidelines.

NPE chooses the most suitable chemical compositions to treat the water and activates and cleans MRM media to ensure maximum media efficiency.

Wastewater Treatment Plant – Digester Cleaning in South Australia

NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…

Huntingdale Sewer Infrastructure Dewatering Project

Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe, accessible, and productive operations. When rainwater or groundwater accumulates in an active…

NPE Bypass Solutions for  Black Rock Water Reclamation Plant

National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…