Student Accommodation Development – NSW
Student Accommodation Development
Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going further 1.5m deep to 6.5m BEGL.
Installation of 240m perimeter dewatering system along with localised pit dewatering. Treatment to ANZEC 95% Freshwater guidelines.
The Chemical Dosing System installation was recommended for efficient water clarification and pH correction. The system is designed to effectively remove silt, sand, and other solids from water at flow rates of up to 5L/s. This makes it an excellent choice for sites with limited space. The system incorporates the addition of flocculants, coagulants, and pH adjustments throughout the treatment process. It also includes monitoring features such as pH, turbidity, and flow meter measurements. The final step of the treatment process at Richards Crookes involves the use of a metals removal module (MRM) for oxidation and filtration, specifically targeting elevated metal concentrations in the water.
Richard Crookes site encounters the presence of heavy metals in its groundwater, including Aluminium, Arsenic, Zinc, Manganese, and Iron. These heavy metals pose a challenge for the project and NPE is committed to meeting the ANZECC & ARMCANZ (2000) freshwater quality guidelines.
NPE chooses the most suitable chemical compositions to treat the water and activates and cleans MRM media to ensure maximum media efficiency.
Critical Sewer Bypass Solution with Dual Diesel Pump System
National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…
Read MoreBypass Pumping Solution at Boundary Creek
National Pump & Energy (NPE) was engaged by the Water Corporation’s Water Resource Development Team (WRDT) to implement a robust…
Read MoreCreek Bypass & Dewatering Success at Mullet Creek
When D4C began infrastructure works at Mullet Creek, they faced complex water management challenges including maintaining creek flow, controlling groundwater…
Read MoreWellpoint Dewatering System Rottnest Island
Compact Wellpoint Dewatering System Delivered for Rottnest Island WWPS Project NPE recently delivered a compact wellpoint dewatering system for a…
Read MoreNPE Doubles the Impact
We’re excited to announce that NPE has pledged to match every dollar we raise-up to $5,000-if we reach our fundraising…
Read MoreWest Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read More