Sewer Bypass, Victoria
NPE was engaged by our client to design and deliver a reliable sewer bypass system with a duty capacity of 50 litres per second at 60 metres head, complete with 100% redundancy.
The system was configured to extract from two sewer manholes and discharge into an existing rising main. To ensure continuous performance monitoring and rapid response, NPE integrated advanced telemetry across the bypass setup. This system enabled real-time access via a dashboard and was programmed to send automated alarm notifications to a designated list of mobile contacts, including NPE staff, in the event of any faults or emergencies.
West Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read MoreEnviroPacific: Former PDP2 Oily Wastewater Pond Remediation
NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse…
Read MoreBroadbeach Dewatering & Water Treatment QLD
Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the…
Read MoreAlkimos Seawater Desalination Plant Perth, WA
The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per…
Read MoreSewer Bypass of Naracoorte WWTP. Naracoorte SA
NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure…
Read MoreDewatering Rustlers Roost
NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end…