Sewer Bypass, Victoria

NPE was engaged by our client to design and deliver a reliable sewer bypass system with a duty capacity of 50 litres per second at 60 metres head, complete with 100% redundancy.

The system was configured to extract from two sewer manholes and discharge into an existing rising main. To ensure continuous performance monitoring and rapid response, NPE integrated advanced telemetry across the bypass setup. This system enabled real-time access via a dashboard and was programmed to send automated alarm notifications to a designated list of mobile contacts, including NPE staff, in the event of any faults or emergencies.

 

 

Huntingdale Sewer Infrastructure Dewatering Project

Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is critical for keeping operations safe, accessible, and productive. When rainwater or groundwater collects in an active…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at a North-West Queensland mine site to lower water levels within the…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…