Re-lining of 39 Wastewater Pumping Chambers throughout SA

Due to aging infrastructure, the client was engaged to commence the re-lining of 39 Wastewater Pumping Chambers throughout South Australia.

To enable the pumping chambers to be accessed for re-lining works, NPE was approached by the client to undertake Bypass Pumping of these stations.

The bypass sites were split into three main areas based on location; SA Rural North, Adelaide Metropolitan and SA Rural South – these are currently being undertaken over an approximately 12-month period.

The vast majority of sites called for fairly minimal pumping flows and heads (below 20 l/sec @ 20m TDH).

The NPE Adelaide Installation Team, headed by Mark McAuley, would install a Duty Submersible Pump (fed via a Generator and Control Panel) and a Standby BBA Diesel unit. This made for the commonality of all equipment and ease of site installation.

The NPE Telemetry Team would assist in setting up 24/7 monitoring and communication of all installations, allowing the NPE Adelaide Service Team to respond promptly to any faults that may occur and allowing NPE and the client to view the system function online remotely.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at Cannington Mine to lower water levels within the Tailings Storage Facility…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…