Digester Clean Wastewater Treatment Plant, Boliver SA
The process of emptying and cleaning the digester involved using specialised pumping equipment provided by NPE. This was suspended from a 60-ton crane for efficient operation and flexibility of movement.The pump used for this task was a heavy-duty hydraulic unit specifically adapted by NPE to handle these projects. To remove…
Read MoreHydromining, WA
A client had requested NPE’s assistance in cleaning out one of their process water dams which was full of slurry/mud,…
Read MoreHydromining – Koolan Iron Ore, WA
To expand the storage capacity of the Sediment Pond at Koolan Island, NPE were engaged to undertake a Hydromining campaign…
Read MoreHydromining Process Water Pond – Pilbara WA
Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These…
Read MoreEmptying and Cleaning the Digester – Boliver SA
Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump…
Read MoreDescaling – Mount Gibson, WA
Descale of slipped and unstable material utilising one of NPE’s remotely controlled high-pressure/flow water cannons. Services Provided NPE provided descaling,…
Read MoreHydromining Rio Tinto – Weipa, QLD
Services Provided Removal of several years of built-up mud in the main water supply dam of the bauxite wash plant.…
Read MoreHydromining Mount – Gibson Iron, WA
NPE was contracted to de-scale the slipped and unstable material, utilising engineered and remotely controlled high-pressure / flow water cannons.…
Read MoreThickener Tank Cleaning – Goldfields WA
During the February Processing Plant shutdown, maintenance tasks were carried out simultaneously on Nickel and Copper Thickeners. Tool time requirement…
Read More