CIVIL DEWATERING SOLUTIONS SPOTLIGHT

Scarborough Beach Stormwater Drainage Refurbishment

The Brighton Beach Scarborough site underwent refurbishment of its stormwater drainage outfall network to enhance water management into the Indian Ocean. This case study highlights the project components, encountered challenges, and implemented solutions. Originally a two-week project, the timeline extended due to design amendments from the principal client, resulting in…

Read More

South Perth Police Station Project

Dewatering systems at the South Perth Police Station Project. NPE were engaged by Builden for the design, supply, install and operation of…

Read More

Dewatering – Rottnest WA

DM Civil engaged with NPE to assist with a Wellpoint Dewatering System for a new DN1200 emergency overflow storage tank…

Read More

Wellpoint Dewatering – SA

Wellpoint Dewatering System for a stormwater upgrade Old Port Road Adelaide, South Australia. Old Port Road is a major arterial…

Read More

Wellpoint Dewatering – WA

NPE were engaged by our client regarding installing an LLDPE 11000 litre tank. The depth to the static groundwater level…

Read More

Student Accommodation Development – NSW

Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park.…

Read More

Challenging Dewatering on Contaminated Grounds – Balcatta WA

We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation…

Read More