South Perth Police Station Project
Dewatering systems at the South Perth Police Station Project.
NPE were engaged by Builden for the design, supply, install and operation of Dewatering systems at the South Perth Police Station Project.
The site is located at 1 Mends Street, South Perth and contains the Heritage listed Old Police Station. The new hospitality venue will be equipped with a basement restaurant dining section as well as a new fit out to the internal and external areas of the Police Station.
NPE were required to lower the water table 1.5m for the below basement plumbing, lift core and basement slab.
We used wellpoint dewatering systems while the basement was being excavated & then switched to a sacrificial (buried) wellpoint system below the basement. This allowed the client to install water proofing, form work, steel and concrete without interacting with any of the dewatering equipment. This also eliminated having several penetrations through the slab and the risk of leaks after completion.
The dewatering effluent had to be passed through a silt trap and then boosted through a series of hoses and pipe work through the storm water network (under Mends st) to a sewer discharge point 200m away.
For the duration of the project NPE also provided Environmental monitoring as it is quite a sensitive area, adjacent to the Swan River.
Wellpoint Dewatering Solution Delivered for Modcon Civil- SA
Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…
Eastern Treatment Plant Bypass – Melbourne, VIC
National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…
Bore Pump Installations & Commissioning – Kalgoorlie WA
The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…
DN630 Pipeline Welding & Installation Project – Queensland
National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…
Poly Butt Welding for Resource Recovery Park
National Pump & Energy (NPE) was engaged to supply experienced poly welders and specialist poly welding equipment to support onsite…
NSW Central Coast Sewer Bypass Upgrade
National Pump & Energy was engaged to design, supply, install, and maintain a temporary sewer bypass pumping system to support…
Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success
We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…