Welcome to the National Pump & Energy Project Spotlight, where we feature major dewatering, pump hire, and power generation projects delivered across Australia. From remote mining operations to urban infrastructure developments, each National Pump & Energy project spotlight demonstrates our ability to provide tailored, high-performance solutions for complex site needs.

Our team at National Pump & Energy works closely with clients to design systems that are efficient, compliant, and reliable—even in the most challenging environments. Whether it's emergency bypass pumping, high-volume water transfer, or power supply in off-grid areas, our project spotlights reveal the depth of our experience and the strength of our fleet.

Browse our latest National Pump & Energy project spotlights to see how we deliver real results with unmatched service and expert engineering.

Learn more about our global capabilities by visiting the Atlas Copco Group—our parent company and a leader in industrial innovation.

  • Filter By Industry

  • Location

PROJECT SPOTLIGHTS

Student Accommodation Development – NSW

Student Accommodation Development Dewatering was required to allow for the construction of student accommodation with a 2-level basement car park. Bulk excavation level approx. 5m BEGL with localised pits going…

Read More

Challenging Dewatering on Contaminated Grounds – Balcatta WA

We were engaged by BOS Civil, which required prompt dewatering in troublesome ground conditions throughout their 2 x extensive basin excavation works in Balcatta, WA.  The following morning, NPE mobilised all…

Read More

Hydromining Process Water Pond – Pilbara WA

Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods…

Read More

Emptying and Cleaning the Digester – Boliver SA

Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE…

Read More

Belconnen Trunk Sewer Augmentation – ACT

NPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the…

Read More

Pump Station Bypass – Queensland

A local water authority recently asked NPE to provide a bypass for a pump station, the pump station needed to be taken offline to complete works. The bypass needed to…

Read More