Oil & Gas Barossa Project

We are thrilled to share that NPE is part of the Barossa Project Surf T&I team, engaged in critical service flowline flooding, pigging, and hydro test operations using our Zone 2 HD500 4” Plunger Pumps.

Located in Indonesia, Bintan, our team utilised a high-pressure 2” FIG 1502 flowline, ensuring robust operational standards offshore.

Our dedicated team includes offshore-certified pump operators and a seasoned project supervisor, ensuring efficiency and safety throughout.

We are excited about these opportunities to contribute to such a significant project and look forward to overcoming challenges and achieving milestones with our team.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at a North-West Queensland mine site to lower water levels within the…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…