NPE Innovative Pumping System for Enhanced Efficiency and Safety. The Rocks, Sydney



NPE is proud to introduce a cutting-edge pumping system that guarantees optimal performance and safety. The system includes the installation of a submersible pump with soft starter, as well as a diesel sludge pump for backup, along with all necessary suction pipes and level controls in a single maintenance hole, complete with full telemetry.
The primary and backup pumps will be connected to a common manifold, with the discharge pipe running to an onsite bypass connection point around 18 meters away. Under normal conditions, the primary pump will operate automatically based on predetermined levels in the maintenance hole. In the event of any issues with the primary unit, the backup pump will seamlessly take over, controlled by its own independent level controls. In case of a power outage, the diesel pump will activate.
To ensure maintenance and operational safety, NPE will implement weekly checks on the bypass equipment during the project operation. Additionally, the system will be configured to send alarm text messages to a predetermined list of mobile numbers, including NPE staff, in the event of high and ultra high-level alarms. Moreover, NPE will provide a link to a dashboard for real-time monitoring during the project.
In the case of an alarm during operating hours, NPE will contact the site supervisor for further evaluation and on-site support if necessary. If an alarm occurs outside normal operating hours, NPE will promptly dispatch personnel to inspect the equipment.
NPE remains committed to ensuring seamless and secure operations through this innovative pumping system, providing peace of mind for all stakeholders involved.
West Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read MoreEnviroPacific: Former PDP2 Oily Wastewater Pond Remediation
NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse…
Read MoreBroadbeach Dewatering & Water Treatment QLD
Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the…
Read MoreAlkimos Seawater Desalination Plant Perth, WA
The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per…
Read MoreSewer Bypass of Naracoorte WWTP. Naracoorte SA
NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure…
Read MoreDewatering Rustlers Roost
NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end…
Read More