Emptying and Cleaning the Digester – Boliver SA
Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane.
The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE for these applications.
The digester contents were pumped out via an NPE installed discharge line, which was connected to an adjacently installed existing pipeline that ran to the storage lagoon.
NPE tests and monitors gas levels throughout the emptying and Confined Space Entry processes.
After emptying and cleaning, the Digester was sprayed with a commercial-grade disinfectant to enable rehabilitation works to be undertaken in a safe and clean environment within the Digester.
West Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney,…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping,…
Read MoreEnviroPacific: Former PDP2 Oily Wastewater Pond Remediation
NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse…
Read MoreBroadbeach Dewatering & Water Treatment QLD
Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the…
Read MoreAlkimos Seawater Desalination Plant Perth, WA
The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per…
Read MoreSewer Bypass of Naracoorte WWTP. Naracoorte SA
NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure…
Read MoreDewatering Rustlers Roost
NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end…
Read More