Emptying and Cleaning the Digester – Boliver SA

Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane.

The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE for these applications.

The digester contents were pumped out via an NPE installed discharge line, which was connected to an adjacently installed existing pipeline that ran to the storage lagoon.

NPE tests and monitors gas levels throughout the emptying and Confined Space Entry processes.

After emptying and cleaning, the Digester was sprayed with a commercial-grade disinfectant to enable rehabilitation works to be undertaken in a safe and clean environment within the Digester.

High-Performance Pumping Solutions for Extreme Weather Events- QLD

Quarry pit dewatering is essential for maintaining safe and productive operations by removing accumulated rainwater and groundwater to prevent flooding…

Assisted Water Reduction Using Evaporation Fans in Queensland

Our client required a 24-unit evaporator fan package at Cannington Mine to lower water levels within the Tailings Storage Facility…

 NPE Bypass Solutions for  Black Rock Water Reclamation Plant

 National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE was engaged to support a remote north-west Queensland operation following significant rainfall, with approximately 370 mm recorded over a…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…