Dewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of pumping wells within the excavation and recharge wells outside the excavation to create an efficient dewatering system that depressurised the aquifers and lowered and maintained the groundwater table by eight (8) metres next to the existing underground tunnel. The biggest challenge of the project was to ensure dewatering extraction did not cause any settlement to the neighbouring infrastructures.
Extracted groundwater was recharged into the aquifers via recharge wells outside the excavation zone. The dewatering system was designed to recharge at 35 litres per second at a suitable operating pressure.
Water was treated via a new and improved customised water treatment system designed to perform inline adjustments to water quality by correcting pH levels and removing iron and other harmful heavy metals before being recharged and discharged into the environment. The project saw progress in technology innovation and improvements in environmental aspects by introducing a custom-built sludge press as the key to sludge management.
Huntingdale Sewer Infrastructure Dewatering Project
Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…
High-Performance Pumping Solutions for Extreme Weather Events- QLD
Quarry pit dewatering is critical for keeping operations safe, accessible, and productive. When rainwater or groundwater collects in an active…
Assisted Water Reduction Using Evaporation Fans in Queensland
Our client required a 24-unit evaporator fan package at a North-West Queensland mine site to lower water levels within the…
NPE Bypass Solutions for Black Rock Water Reclamation Plant
National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…
Wet Season Management in North-West Queensland Mining
NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…





