Bypass Pumping, Carseldine QLD

NPE was engaged to provide a sewer bypass while an existing main was realigned, the project’s larger scope is to construct a bridge over a rail crossing. Constraints we overcome with collaborative works between NPE and our client. We thank our client and the government authorities for the opportunity to provide our services.

Read More

Cardinia Pump Station Upgrade, Cardinia VIC

Cardinia pump station at Cardinia Reservoir, was pumped up to Kalista Pump Station, approximately 125m static head. The bypass system was reversed pumped through the existing pipe network to feed the Kalister pump station. This was to allow Monbulk Pumpstation and the main feed pipeline from Silvan Reservoir to be taken offline at the same…

Read More

Bypass Solutions, Monbulk VIC

NPE was engaged to supply a potable water bypass pumping system, while the existing Monbulk pump station at Silvan Reservoir was receiving a major structural overhaul and new pumps. In conjunction with AMS and Melbourne Water, a bypass system was designed to be able to confidently take the existing pump station offline for an extended…

Read More

Successful Mechanical Dewatering, Perth Metro WRRF

NPE is an expert in digester cleaning and sludge removal. We are proud to announce that NPE has been awarded another anaerobic digester contract to clean, empty, screen and desludge the material via one of our new state of the art mobile centrifuge units for one of our valued clients. With support from our Conhur…

Read More

Pumping & Testing Operations, WA

NPE oil & gas team was initially contracted by a client to provide a high-pressure pumping package for an R&D project. What began as a straightforward equipment hire agreement, including operators, evolved into a comprehensive solution where NPE managed the entire project. When the client encountered roadblocks with the planned site, NPE stepped in to…

Read More

Bypass Pumping, Penrith NSW

NPE Supplying Penrith with a Wastewater Bypass System to Facilitate Pump Station Upgrades Installing a wastewater bypass system in Penrith marks a significant milestone in upgradingthe main pump station. NPE, a leading provider of wastewater solutions, has successfully supplied and installed the system, ensuring minimal disruption to essential services during the upgrade process. The wastewater…

Read More

Sewage Bypass Management Project Tuross, NSW

NPE Temporary Sewage Bypass Management Project Underway in Tuross, NSW NPE is pleased to announce that it has been engaged by IronBuilt Infrastructure to commence the temporary sewage bypass management and construction project in Tuross, NSW. The project aims to facilitate the upgrade of the existing infrastructure by the Civil team. NPE has diligently developed…

Read More

Bypass Solutions Victoria

NPE was contracted to carry out an emergency stormwater bypass installation due to the pump station experiencing multiple pump failures, which reduced pump station capacity. New replacement pumps had been ordered for the pump station, but there was a substantial lead time for the replacement pumps’ arrival. It is even more critical to have a…

Read More

Oil & Gas Barossa Project

We are thrilled to share that NPE is part of the Barossa Project Surf T&I team, engaged in critical service flowline flooding, pigging, and hydro test operations using our Zone 2 HD500 4” Plunger Pumps. Located in Indonesia, Bintan, our team utilised a high-pressure 2” FIG 1502 flowline, ensuring robust operational standards offshore. Our dedicated…

Read More

Port August Bypass, South Australia

The local water authority in South Australia had some major works with one of their pumping stations which required the system to be off-line for approximately 2 weeks. Being a critical station in the sewer network, NPE were engaged by their contractor to undertake temporary sewer bypass works which entailed diverting the raw sewerage around…

Read More