Project Spotlight
Pumping & Testing Operations, WA
NPE oil & gas team was initially contracted by a client to provide a high-pressure pumping package for an R&D project. What began as a straightforward equipment hire agreement, including operators, evolved into a comprehensive solution where NPE managed the entire project. When the client encountered roadblocks with the planned site, NPE stepped in to…
Read MoreBypass Pumping, Penrith NSW
NPE Supplying Penrith with a Wastewater Bypass System to Facilitate Pump Station Upgrades Installing a wastewater bypass system in Penrith marks a significant milestone in upgradingthe main pump station. NPE, a leading provider of wastewater solutions, has successfully supplied and installed the system, ensuring minimal disruption to essential services during the upgrade process. The wastewater…
Read MoreSewage Bypass Management Project Tuross, NSW
NPE Temporary Sewage Bypass Management Project Underway in Tuross, NSW NPE is pleased to announce that it has been engaged by IronBuilt Infrastructure to commence the temporary sewage bypass management and construction project in Tuross, NSW. The project aims to facilitate the upgrade of the existing infrastructure by the Civil team. NPE has diligently developed…
Read MoreBypass Solutions Victoria
NPE was contracted to carry out an emergency stormwater bypass installation due to the pump station experiencing multiple pump failures, which reduced pump station capacity. New replacement pumps had been ordered for the pump station, but there was a substantial lead time for the replacement pumps’ arrival. It is even more critical to have a…
Read MoreOil & Gas Barossa Project
We are thrilled to share that NPE is part of the Barossa Project Surf T&I team, engaged in critical service flowline flooding, pigging, and hydro test operations using our Zone 2 HD500 4” Plunger Pumps. Located in Indonesia, Bintan, our team utilised a high-pressure 2” FIG 1502 flowline, ensuring robust operational standards offshore. Our dedicated…
Read MorePort August Bypass, South Australia
The local water authority in South Australia had some major works with one of their pumping stations which required the system to be off-line for approximately 2 weeks. Being a critical station in the sewer network, NPE were engaged by their contractor to undertake temporary sewer bypass works which entailed diverting the raw sewerage around…
Read MoreDewatering for the construction of an apartment complex in Sydney, NSW
NPE maintains a large and diversified range of high-end pumping, power generation and associated equipment for hire or sale to suit any requirement. Committed to sourcing the world’s best equipment brands, NPE delivers the best-performing, safest and most reliable gear for your site. NPE doesn’t just deliver a piece of equipment, we work with our…
Read MoreWellpoint Dewatering System for our client in Goolwa, SA
NPE installed a Wellpoint Dewatering System for our client in Goolwa.Our client was laying sewer for new development when they discovered groundwater 1m to 1.8m below ground level. NPE installed a 50m system to a depth of 6m to ensure groundwater was lowered beneath their 3.6m invert. This system worked flawlessly and was operational for…
Read MoreDewatering & Water Treatment, South Perth WA
NPE were engaged by PACT Construction for the Dewatering, Water Treatment & Environmental scope for the development of Riviere Luxury Residence in Applecross. Several large footing foundations and multiple general excavations will require dewatering for the first stage of the project. With limited dewatering discharge options available in the area, discharge to the Swan River…
Read MoreWell Point Dewatering, Perth WA
NPE were engaged by Alita Constructions to install dewatering at 2 different locations at their project located on Dowd St, Welshpool. The purpose of the install was to allow the client to excavate below the water table to complete the final connection of the site stormwater system and install a large aerobic treatment unit. We…
Read More