Pipelines & Construction – Ceduna SA
The Jacinth-Ambrosia mine site is located approximately 300km northwest of Ceduna, South Australia.An existing Mining Unit Plant is to be relocated from Jacinth North to the Ambrosia deposit, approximately 5km away, whilst returning the ModCoD tailing deposition to Jacinth North. The Project is being managed and resourced from WA with logistic and administration support from…
Read MoreSewage Bypass, 18m Deep Manhole – Victoria
NPE were engaged in managing and constructing a sewer bypass for new sewer connections works to be carried out in a 10-day operation. Our Melbourne team are the leading provider in bypass pumping. We deliver the complete bypass solution. With flow management plans, Telemetry displays full visibility on critical pumping performance values & flow, pumping…
Read MoreFast Turnaround Solution Supplied to our Client Katoomba NSW
Emergency bypass with no room for error! We supplied remote monitoring & telemetry on all units. The client required an urgent solution for their sewer bypass system. We offered a packaged system using a standard SPP trailer diesel pump. Due to the site’s remoteness, the system was required to operate in auto. The following day…
Read MorePerth City Link Rail
NPE was contracted with the Perth City Link Rail Alliance to provide a detailed design, construct and supply, operate and maintain a dewatering and water treatment system for the Pedestrian underpass, the 620m cut and cover tunnel and the approach ramps between the heritage listed Horseshoe Bridge and Milligan Street. The scope involved design and installation of…
Read MoreRoy Hill Iron Ore Train Unloader
The Roy Hill project includes the construction of a new iron ore mine at Roy Hill deposit, a mine processing plant and a heavy haul railway system from the mine to the port in the south west region of Port Hedland. NPE was contracted to design and install a dewatering system inclusive of drilling boreholes that…
Read MoreDewatering & Water Treatment at Perth Busport Project, WA
NPE were involved in this project for the drilling and installation of a series of pumping wells within the excavation and recharge wells outside the excavation to create an efficient dewatering system that depressurised the aquifers and lowered and maintained the groundwater table by eight (8) metres next to the existing underground tunnel. The biggest…
Read MoreElizabeth Quay Project, WA
The Elizabeth Quay project is located in the centre of Perth’s river foreshore and located next to the landmark Perth Bell Tower. The Scope of works was to design the system, perform all of the dewatering onsite and monitor the disposal of all waters captured onsite for the construction of an artificial inlet on what…
Read MoreCivil-Dewatering-Tug Harbour Project, WA
NPE were contracted to perform dewatering work and water treatment for the development of new Tug Harbour and material offload facility at Hunt point on Port Hedland’s Finucane Island. The new Tug Boat Harbour will house an extra 8 tugs, serves to lay some of the foundations for a massive outer harbour expansion in the near…
Read MoreKings Square Development Project
The Kings Square Project was situated in the middle of Perth City Link and is a Western Australian Government Project. This project saw the creative collaborative works of several head contractors such as John Holland Group, Broad Constructions and Broad Civil. NPE were the preferred dewatering contractor during the development of the first four buildings, KS1,…
Read MoreBrisbane Airport QLD
McConnell Dowell was awarded the contract for the Dryandra Road Works, a significant structural element of the New Parallel Runway by Brisbane Airport Corporation (BAC). The Dryandra Road Project is a reinforced concrete 4-lane underpass structure, supported on approximately 700 precast concrete piles including 1.5km of roadway, full underpass fit-out with portions of taxiway and…