Dewatering Rustlers Roost

NPE Darwin offering dewatering packages in preparation for the 3 billion litres of water that will hit the top end this wet season. Mount Bundy Creek, Northern Territory our NPE Darwin expert team manages and maintains two pit dewatering packages. Our packages include submersible floats, silent generators, fuel cells with ongoing refuelling, and telemetry, which…

Read More

McArthur River Mine Dewatering, NT

The McArthur River Mine, located on one of the world’s largest zinc and lead deposits, is located 970 kilometres southeast of Darwin. In late March, the site was heavily impacted by Tropical Cyclone Megan, which brought approximately 350 mm of rain in 48 hours, causing significant disruption to mining operations. NPE was engaged to manage…

Read More

Water Seepage Management Solution

NPE’s client recognised the need for a robust water seepage management system to mitigate potential flood risks to the Wedgefield industrial area. This requirement emerged alongside the dredging works, which were expected to raise water levels in the Dredge Material Management Areas, thereby increasing groundwater levels due to seepage. NPE was engaged to provide a…

Read More

Open Pit Dewatering, Southern Cross WA

This project involves installing and commissioning a leak detection system designed by NPE for a client located in Southern Cross, WA. The system is installed in Fraser Pit, located on the town’s outskirts. NPE has engineered and installed the system and is responsible for selling the leak detection system to the client. The system is…

Read More

Pontoon Open Pit Dewatering Packages Stage 1 – WA

Pontoon Open Pit Dewatering Packages Stage 1, WA The Woodie Woodie mine site is ConsMin‘s key asset and is located approximately 400km south-east of Port Hedland. The operation consists of open-pit mining across several pits and a 1.6Mtpa processing plant. The tenement consists of 1,290km2 of exploration tenements and 100km2 in the mining corridor. Manganese ore…

Read More

Pit Dewatering – Kalgoorlie, WA

NPE was engaged for Mine Pit Dewatering in Kalgoorlie for a long-term customer expanding their mine. The client required a three-series pump set-up system engineered and installed. This system set-up consisted of submersible pumps attached to NPE pontoons pumping water to a booster pump system, which then pumps the water to another booster pump system…

Read More

Sump Dewatering Spoilbank Marina – Port Hedland WA

The marina’s construction will relieve pressure on existing boat launching facilities while improving recreational boaters’ access and safety. It will also provide a lively new amenity for the whole community of Port Hedland to enjoy.The marina is expected to be operational in 2023. About Sump DewateringUnderground dewatering and drainage are required for mining operations, quarries,…

Read More

Quarry Dewatering – WA

The client contacted NPE for a High Head Water Pump capable of pumping water to an RL increase of approx. 60m to assist in the dewatering of a quarry in WA. NPE offered a pump package that helped drain the pit on schedule and within budget.

Read More