Open Pit Dewatering, Southern Cross WA

This project involves installing and commissioning a leak detection system designed by NPE for a client located in Southern Cross, WA.

The system is installed in Fraser Pit, located on the town’s outskirts. NPE has engineered and installed the system and is responsible for selling the leak detection system to the client. The system is designed to be used in two stages. The first stage involves using two 90kw MineTuff pumps, which will pump at 210l/s initially. The second stage will use three 90kw MineTuff pumps, which will pump at 185l/s. The duration of pumping is set to take 242 days to pump a total of 3,247,591 m3 of water.

The impellers have been trimmed to suit the water’s specific gravity to ensure the pumps operate efficiently. The primary objective of this project is to ensure the reliable and efficient pumping of water while detecting and preventing any leaks that may occur in the system. If you require a leak detection system, please don’t hesitate to contact us today. Our team of experts is ready to assist you in finding the best solution for your needs and ensuring that your system operates effectively.

Wastewater Treatment Plant – Digester Cleaning in South Australia

NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…

Huntingdale Sewer Infrastructure Dewatering Project

Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…

NPE Bypass Solutions for  Black Rock Water Reclamation Plant

National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…

Wet Season Management in North-West Queensland Mining​

NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…

Royal Far West Manly Dewatering

NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…

PFAS Treatment Perth, WA

The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…

Critical Sewer Bypass Solution with Dual Diesel Pump System

National Pump & Energy (NPE) was engaged to support a critical infrastructure project with a temporary sewer bypass solution. The…