Digester Clean Wastewater Treatment Plant, Boliver SA

The process of emptying and cleaning the digester involved using specialised pumping equipment provided by NPE. This was suspended from a 60-ton crane for efficient operation and flexibility of movement. The pump used for this task was a heavy-duty hydraulic unit specifically adapted by NPE to handle these projects. To remove the contents of the…

Read More

Hydromining, WA

A client had requested NPE’s assistance in cleaning out one of their process water dams which was full of slurry/mud, thus reducing the storage capacity for valuable water. NPE provided a complete Hydromining Package and four of its skilled technicians to carry out the work. The technicians were able to complete the installation, commissioning, operation,…

Read More

Hydromining – Koolan Iron Ore, WA

To expand the storage capacity of the Sediment Pond at Koolan Island, NPE were engaged to undertake a Hydromining campaign to remove approximately 3,600m3 of settled solids. NPE used a high-pressure water technique to break down the compacted material into a slurry via water sourced from three Hydromining cannons on the sediment pond’s external perimeter.…

Read More

Hydromining Process Water Pond – Pilbara WA

Over time, water ponds that are gravity fed become full of tailings, which reduce their storage and surge capacity. These ponds require tailings to be removed periodically; however, excavation methods can present some risks of liner damage. Hydromining is the perfect solution. It agitates the solids (tailing build-up), pumping it back to the tailings dam.…

Read More

Emptying and Cleaning the Digester – Boliver SA

Digester emptying and cleaning works were carried out utilising NPE’s purpose-built pumping/mixing equipment suspended from a 60t crane. The pump is a heavy-duty, hydraulically powered unit specifically modified by NPE for these applications. The digester contents were pumped out via an NPE installed discharge line, which was connected to an adjacently installed existing pipeline that…

Read More

Descaling – Mount Gibson, WA

Descale of slipped and unstable material utilising one of NPE’s remotely controlled high-pressure/flow water cannons. Services Provided NPE provided descaling, utilising four of our highly trained Hydromining staff to collapse the material and render the area stable once again.  Equipment:

Read More

Thickener Tank Cleaning – Goldfields WA

During the February Processing Plant shutdown, maintenance tasks were carried out simultaneously on Nickel and Copper Thickeners. Tool time requirement was 96 hours, and all four thickeners were required to be emptied and cleaned within a 12-hour shift. Our client cannot achieve this in-house; therefore, historically, they only attempted to maintain 1 or 2 thickeners…

Read More